Direct factory labor is usually considered to be


A) a variable cost.
B) a fixed cost.
C) a semi-variable cost.
D) a mixed cost.

E) None of the above
F) C) and D)

Correct Answer

verifed

verified

SweetBerry Ice-creams uses a standard cost system.The following data is available for June: SweetBerry Ice-creams uses a standard cost system.The following data is available for June:   The actual material cost for June was: A)  $48,000. B)  $50,400. C)  $49,770. D)  $51,030. The actual material cost for June was:


A) $48,000.
B) $50,400.
C) $49,770.
D) $51,030.

E) B) and D)
F) All of the above

Correct Answer

verifed

verified

Two variances associated with analyzing manufacturing overhead costs are the production volume variance and the flexible budget variance.

A) True
B) False

Correct Answer

verifed

verified

True

Costs that tend to change in total directly with the volume of manufacturing activity are called ____________________ costs.

Correct Answer

verifed

verified

variable

The high-low point method results can be misleading if the activity is not reflective of the normal activity.

A) True
B) False

Correct Answer

verifed

verified

Examples of fixed manufacturing costs include all of the following except:


A) depreciation.
B) utilities.
C) insurance.
D) taxes.

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

The Hoatzin Birdhouse Factory produced the following standard cost card.In July,the company had an order for 500 birdhouses (Model: Wren)for Job No.CB32.Manufacturing overhead is based on direct labor hours.The manufacturing overhead cost estimates for the year total $32,400 and total direct labor hours are estimated at 9,000 for the year.Complete the Standard Cost Card and Job Order Cost Sheet.Calculate the total cost variance. The Hoatzin Birdhouse Factory produced the following standard cost card.In July,the company had an order for 500 birdhouses (Model: Wren)for Job No.CB32.Manufacturing overhead is based on direct labor hours.The manufacturing overhead cost estimates for the year total $32,400 and total direct labor hours are estimated at 9,000 for the year.Complete the Standard Cost Card and Job Order Cost Sheet.Calculate the total cost variance.    The Hoatzin Birdhouse Factory produced the following standard cost card.In July,the company had an order for 500 birdhouses (Model: Wren)for Job No.CB32.Manufacturing overhead is based on direct labor hours.The manufacturing overhead cost estimates for the year total $32,400 and total direct labor hours are estimated at 9,000 for the year.Complete the Standard Cost Card and Job Order Cost Sheet.Calculate the total cost variance.

Correct Answer

verifed

verified

Manufacturing overhead is $3.60 per hour...

View Answer

The difference between the total standard cost and the total actual cost is the ___________________.

Correct Answer

verifed

verified

Better Blankets,Inc.makes a SnuggieBlank using flannel material and trim binding.They have instituted a successful JIT system and thus no longer have to stock inventory prior to their production need.The Standard Cost Card for The SnuggieBlank model is shown. Better Blankets,Inc.makes a SnuggieBlank using flannel material and trim binding.They have instituted a successful JIT system and thus no longer have to stock inventory prior to their production need.The Standard Cost Card for The SnuggieBlank model is shown.   The company reported the following results concerning January results:   The material price variance for Trim used in January is: A)  $5,640 favorable. B)  $5,640 unfavorable. C)  $1,440 favorable. D)  $1,440 unfavorable. The company reported the following results concerning January results: Better Blankets,Inc.makes a SnuggieBlank using flannel material and trim binding.They have instituted a successful JIT system and thus no longer have to stock inventory prior to their production need.The Standard Cost Card for The SnuggieBlank model is shown.   The company reported the following results concerning January results:   The material price variance for Trim used in January is: A)  $5,640 favorable. B)  $5,640 unfavorable. C)  $1,440 favorable. D)  $1,440 unfavorable. The material price variance for Trim used in January is:


A) $5,640 favorable.
B) $5,640 unfavorable.
C) $1,440 favorable.
D) $1,440 unfavorable.

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

As the level of activity increases,the total variable costs for the period


A) increase.
B) decrease.
C) do not change.
D) may increase or decrease.

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

Semi-variable costs vary in direct proportion to the volume of activity.

A) True
B) False

Correct Answer

verifed

verified

Canine Cottage Industries makes several specially designed doghouses.The Standard Cost Card for The Gables model is shown.A customer ordered three of this model for their Labrador retrievers.The Job Cost Sheet is shown. Canine Cottage Industries makes several specially designed doghouses.The Standard Cost Card for The Gables model is shown.A customer ordered three of this model for their Labrador retrievers.The Job Cost Sheet is shown.     From the information given for Canine Cottage Industries,compute the labor total,time and rate variances. Canine Cottage Industries makes several specially designed doghouses.The Standard Cost Card for The Gables model is shown.A customer ordered three of this model for their Labrador retrievers.The Job Cost Sheet is shown.     From the information given for Canine Cottage Industries,compute the labor total,time and rate variances. From the information given for Canine Cottage Industries,compute the labor total,time and rate variances.

Correct Answer

verifed

verified

In a factory,the total variable costs are $600 if 500 units are produced.If 800 units are produced,the variable cost per unit would be


A) $1.20
B) $1.11
C) $1.00
D) $0.75

E) B) and D)
F) A) and D)

Correct Answer

verifed

verified

If a price variance for materials is unfavorable,the quantity variance for materials also must be unfavorable.

A) True
B) False

Correct Answer

verifed

verified

The flexible budget usually shows


A) only fixed costs.
B) only variable costs.
C) fixed and variable costs together.
D) fixed and variable costs separately.

E) B) and C)
F) All of the above

Correct Answer

verifed

verified

Costs that vary in some degree with the volume of activity,but not in direct proportion to it are called ____________________ costs.

Correct Answer

verifed

verified

semi-varia...

View Answer

If the actual cost of an item is lower than the standard cost,a(n)____________________ price variance will be recognized.

Correct Answer

verifed

verified

The general model for computing a price variance is:


A) difference in unit price × actual quantity of inputs.
B) difference in unit price × standard quantity of inputs.
C) standard price × (actual quantity of inputs - standard quantity allowed for units of output) .
D) actual price × difference in quantity of inputs.

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

A budget that shows expected costs at more than one level of activity is called a(n)____________________ budget.

Correct Answer

verifed

verified

flexible

A decrease in activity level will result in:


A) a decrease in fixed unit cost.
B) total fixed cost remaining constant.
C) a decrease in total fixed cost.
D) a decrease in unit variable cost.

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified