The document that serves as the basis for recording direct labor on a job cost sheet is the clock card.

A) True
B) False

Correct Answer

verifed

verified

Recording jobs completed would include a credit to


A) Factory Overhead
B) Finished Goods
C) Work in Process
D) Cost of Goods Sold

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

National Survey Company uses a job order cost system. a) Indicate the source of the data for debiting Work in Process for each of the following: 1) Direct materials requisitioned 2) Direct labor used b) Indicate the source of the data for crediting Work in Process for jobs completed. c) Present a list of the three controlling accounts used in the general ledger to record the inventories and, in each case, indicate the related subsidiary ledger.

Correct Answer

verifed

verified

a) 1) Summary of materials req...

View Answer

On May 15, the stamping department accepted Job 051507A to make 1,000 funnels. Materials requisitioned was 1,100 sheets at $1.20 per sheet and 1,150 grommets at $0.15 per set. The cost driver used by stamping department is the drop-forge strokes indicated by a machine mounted counter. Overhead is applied at $2.25 for each drop-forge stroke. Additionally, $375.00 of overhead is applied to each job due to setup and tear down. Direct labor is applied at $22.50 per hour for the machine operator and $11.10 for the machine loader. The job required 6.5 hours of labor. Upon completion, the job was transferred to Finished Goods Inventory. Journalize all events as of May 15.

Correct Answer

verifed

verified

Which of the following entries would not be found on the books of a service provider?


A) a debit to Work in Process; and a credit to Materials
B) a debit to Work in Process; and a credit to Wages Payable
C) a debit to Work in Process; and a credit to Overhead
D) a debit to Cost of Services; and a credit to Work in Process

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

Classify each of the preceding costs as product costs or period costs. For those costs classified as product costs, indicate whether the product cost is a direct materials cost, direct labor cost, or factory overhead cost. For those costs classified as period costs, indicate whether the period cost is a selling expense or an administrative expense. Use the following tabular headings for preparing your answer. Place an X in the appropriate column. Classify each of the preceding costs as product costs or period costs. For those costs classified as product costs, indicate whether the product cost is a direct materials cost, direct labor cost, or factory overhead cost. For those costs classified as period costs, indicate whether the period cost is a selling expense or an administrative expense. Use the following tabular headings for preparing your answer. Place an X in the appropriate column.   ANSWER:   -Discuss how job order cost information is used in decision making. What are some possible reasons that actual cost of materials would exceed expected costs for a job? ANSWER: Classify each of the preceding costs as product costs or period costs. For those costs classified as product costs, indicate whether the product cost is a direct materials cost, direct labor cost, or factory overhead cost. For those costs classified as period costs, indicate whether the period cost is a selling expense or an administrative expense. Use the following tabular headings for preparing your answer. Place an X in the appropriate column.   ANSWER:   -Discuss how job order cost information is used in decision making. What are some possible reasons that actual cost of materials would exceed expected costs for a job? -Discuss how job order cost information is used in decision making. What are some possible reasons that actual cost of materials would exceed expected costs for a job?

Correct Answer

verifed

verified

Since a job order cost system provides p...

View Answer

A manufacturing business reports just two types of inventory on its balance sheet: work in process inventory and finished goods inventory.

A) True
B) False

Correct Answer

verifed

verified

Cranston Company estimates the following overhead costs for the coming year:  Equipment depreciation $160,000 Equipment maintenance 60,000 Supervisory salaries 40,000 Factory rent 100,000‾ Total $360,000\begin{array} { l c } \text { Equipment depreciation } & \$ 160,000 \\\text { Equipment maintenance } & 60,000 \\\text { Supervisory salaries } & 40,000 \\\text { Factory rent } & \underline { 100,000 } \\\text { Total } & \$ 360,000 \\\hline\end{array} Cranston is also budgeting $600,000 in direct labor costs and 15,000 machine hours for the coming year. Required: a. Calculate the predetermined overhead rate using direct labor costs as the allocation base. b. Calculate the predetermined overhead rate using machine hours as the allocation base.

Correct Answer

verifed

verified

a. $360,000/$600,000 = 60% of ...

View Answer

If factory overhead applied exceeds the actual costs, overhead is said to be under applied.

A) True
B) False

Correct Answer

verifed

verified

Each document in the cost ledger is called a


A) finished goods sheet
B) stock record
C) materials requisition
D) job cost sheet

E) A) and C)
F) C) and D)

Correct Answer

verifed

verified

Match the costs that follow to the type of product cost a-c) or designate as not a product cost d) . -maintenance supplies


A) direct labor
B) direct materials
C) factory overhead
D) not a product cost

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

Match each of the following phrases with the term a-e) that it most closely describes it. Each term will be used only once. -serves as the basis for recording materials used


A) job cost sheets
B) materials requisitions
C) receiving report
D) time tickets
E) cost allocation

F) All of the above
G) A) and E)

Correct Answer

verifed

verified

Using the job order cost system, service organizations are able to bill customers on a weekly or monthly basis, even when the job has not been completed.

A) True
B) False

Correct Answer

verifed

verified

Each account in the work in process subsidiary ledger in a job order costing system is called a job cost sheet.

A) True
B) False

Correct Answer

verifed

verified

The source document for the data for debiting Work in Process for direct materials is a


A) purchase order
B) purchase requisition
C) materials requisition
D) receiving report

E) B) and D)
F) None of the above

Correct Answer

verifed

verified

The journal entry to record the purchase of $45,000 of raw materials is The journal entry to record the purchase of $45,000 of raw materials is

Correct Answer

verifed

verified

Job order costing and process costing are


A) pricing systems
B) cost accounting systems
C) cost flow systems
D) inventory tracking systems

E) A) and B)
F) A) and D)

Correct Answer

verifed

verified

If the under applied factory overhead amount is immaterial, it is transferred to Cost of Goods Sold at the end of the fiscal year.

A) True
B) False

Correct Answer

verifed

verified

The Cavy Company estimates that the factory overhead for the following year will be $1,470,000. The company has decided that the basis for applying factory overhead should be machine hours, which is estimated to be 40,000 hours. Calculate the predetermined overhead rate to apply factory overhead.

Correct Answer

verifed

verified

$1,470,000...

View Answer

When the goods are sold, their costs are transferred from Work in Process to Finished Goods.

A) True
B) False

Correct Answer

verifed

verified

Showing 101 - 120 of 195