A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data: A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:   Approximately how long will it take to produce the 10<sup>th</sup> unit? A) 1 hour B) 2 hours C) 3 hours D) 4 hours E) 5 hours Approximately how long will it take to produce the 10th unit?


A) 1 hour
B) 2 hours
C) 3 hours
D) 4 hours
E) 5 hours

F) A) and D)
G) A) and E)

Correct Answer

verifed

verified

If the elapsed time for the task is short and the activity is somewhat routine, a modest amount of improvement occurs during the first few repetitions.

A) True
B) False

Correct Answer

verifed

verified

In motion studies, a therblig is a:


A) charting method of analysis.
B) job enrichment technique.
C) dummy task.
D) basic elemental motion.
E) fraction (0.0006) of a minute.

F) C) and E)
G) B) and D)

Correct Answer

verifed

verified

Asking a group of employees at a particular level to take on more responsibility is a form of _____ loading, also known as job _____.


A) horizontal; enlargement
B) horizontal; rotation
C) vertical; rotation
D) vertical; enrichment
E) horizontal; enrichment

F) B) and E)
G) C) and E)

Correct Answer

verifed

verified

A methods and measurements analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse. In a preliminary study, she observed one of her workers perform this task six times with the following results: A methods and measurements analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse. In a preliminary study, she observed one of her workers perform this task six times with the following results:   What is the standard time for this task if the employee worked at a 20 percent faster pace than average and an allowance of 25 percent of job time is used? A) 40 seconds B) 50 seconds C) 53.3 seconds D) 60 seconds E) 64 seconds What is the standard time for this task if the employee worked at a 20 percent faster pace than average and an allowance of 25 percent of job time is used?


A) 40 seconds
B) 50 seconds
C) 53.3 seconds
D) 60 seconds
E) 64 seconds

F) All of the above
G) B) and D)

Correct Answer

verifed

verified

A worker-machine chart can be used to determine how many machines an operator can manage.

A) True
B) False

Correct Answer

verifed

verified

In a stopwatch time study, the average of the times recorded for a given worker to perform a given task is the:


A) observed time.
B) normal time.
C) standard time.
D) allowance time.
E) performance rating time.

F) All of the above
G) B) and E)

Correct Answer

verifed

verified

Which sample proportion will require the largest number of work sampling observations for a given confidence level and allowable error?


A) 0.05
B) 0.25
C) 0.50
D) 0.75
E) 0.95

F) A) and C)
G) A) and E)

Correct Answer

verifed

verified

An 80 percent learning curve means that with each doubling of repetitions there will be a 20 percent decrease in time per unit.

A) True
B) False

Correct Answer

verifed

verified

From the worker's perspective, an output-based pay system has the advantage of:


A) linking pay more directly to effort.
B) keeping earnings stable.
C) keeping pay totally in the worker's control.
D) minimizing the temptation to work harder for more money.
E) keeping effort from influencing pay.

F) A) and B)
G) A) and D)

Correct Answer

verifed

verified

When are learning curves most relevant to managerial decision making in mass production settings?


A) late in product life cycles
B) in the maturity phase
C) in the decline phase
D) before processes are stabilized
E) never

F) C) and E)
G) C) and D)

Correct Answer

verifed

verified

A methods and measurement analyst wants to develop a time standard for a certain task. In a preliminary study, he observed one worker perform the task six times with an average observed time of 20 seconds and a standard deviation of 2 seconds. What is the standard time for this task if the employee worked at a 20 percent faster pace than average, and an allowance of 25 percent of job time is used?


A) 20 seconds
B) 25 seconds
C) 26.7 seconds
D) 30 seconds
E) 32 seconds

F) C) and E)
G) C) and D)

Correct Answer

verifed

verified

On a log-log graph, learning curves appear as:


A) upward-curving lines.
B) downward-curving lines.
C) straight lines.
D) lines which increase at a decreasing rate.
E) lines which decrease at a decreasing rate.

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

Work sampling involves the use of some method of randomizing the observations.

A) True
B) False

Correct Answer

verifed

verified

Process chart symbols do not include:


A) delay.
B) inspection.
C) operation.
D) rejection.
E) storage.

F) B) and D)
G) None of the above

Correct Answer

verifed

verified

Which is not a requirement for an effective self-directed team?


A) talent and skills to meet goals
B) one or more members representing supervision
C) a system of reinforcement and celebration
D) clearly stated and commonly held vision and goals
E) effective and skilled interpersonal relations

F) B) and E)
G) A) and B)

Correct Answer

verifed

verified

The technique which can be used to estimate the percentage of time a worker or piece of equipment is idle is known as:


A) MTM.
B) work sampling.
C) methods analysis.
D) micro motion study.
E) none of these.

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results: A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results:   What is the standard time for this task if the employee worked at a 25 percent faster pace than average and an allowance of 20 percent of job time is used? A) 80 seconds B) 96 seconds C) 100 seconds D) 120 seconds E) 125 seconds What is the standard time for this task if the employee worked at a 25 percent faster pace than average and an allowance of 20 percent of job time is used?


A) 80 seconds
B) 96 seconds
C) 100 seconds
D) 120 seconds
E) 125 seconds

F) C) and D)
G) A) and E)

Correct Answer

verifed

verified

Work sampling is most frequently used to set time standards.

A) True
B) False

Correct Answer

verifed

verified

A performance rating of less than 1.0 means that the observed worker was judged to be working at a faster than normal rate-doing the job more quickly than normal.

A) True
B) False

Correct Answer

verifed

verified