Filters
Question type

Study Flashcards

Which of the following is least likely to be a source of disruption that results in less than the desired output in a high-volume system?


A) equipment failures
B) material shortages
C) accidents
D) worker absences
E) demand variability

F) D) and E)
G) B) and C)

Correct Answer

verifed

verified

Eva, the owner of Eva's Second Time Around Wedding Dresses, currently has five dresses to be altered, shown in the order in which they arrived:  Job  Processing Time  (hrs)   Due  (hrs from now)   V 35 W 11 X 49 Y 23 Z 57\begin{array} { c c c } \text { Job } & \begin{array} { r } \text { Processing Time } \\\text { (hrs) }\end{array} & \begin{array} { c } \text { Due } \\\text { (hrs from now) }\end{array} \\\text { V } & 3 & 5 \\\text { W } & 1 & 1 \\\text { X } & 4 & 9 \\\text { Y } & 2 & 3 \\\text { Z } & 5 & 7\end{array} If Eva uses the shortest processing time first priority rule to schedule these jobs, what will be the average job tardiness?


A) 2 hours
B) 2.2 hours
C) 2.33 hours
D) 2.4 hours
E) 3 hours

F) B) and E)
G) None of the above

Correct Answer

verifed

verified

A Gantt chart is a basic scheduling tool that works best for high-volume systems.

A) True
B) False

Correct Answer

verifed

verified

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows:  Car  Body Work  (hrs)   Paint  (hrs)   A 102 B 54 C 75 D 36 E 17\begin{array} { c c c } \text { Car } & \begin{array} { c } \text { Body Work } \\\text { (hrs) }\end{array} & \begin{array} { c } \text { Paint } \\\text { (hrs) }\end{array} \\\text { A } & 10 & 2 \\\text { B } & 5 & 4 \\\text { C } & 7 & 5 \\\text { D } & 3 & 6 \\\text { E } & 1 & 7\end{array} What is the idle time at the paint work center for the optimal schedule?


A) 1 hour
B) 2 hours
C) 4 hours
D) 7 hours
E) 10 hours

F) C) and D)
G) None of the above

Correct Answer

verifed

verified

Line balancing is a major factor in the design and scheduling of low-volume systems because of batch processing.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not usually a characteristic of successful high-volume systems?


A) smooth workflow through the system
B) customized output
C) rapid repair of breakdowns
D) minimal quality problems
E) reliable supply schedules

F) B) and D)
G) A) and E)

Correct Answer

verifed

verified

The following matrix shows relative costs for various job-machine combinations. Assume there must be one-to-one matching between jobs and machines. Which set of pairs constitutes the minimum-cost solution using the assignment method? The following matrix shows relative costs for various job-machine combinations. Assume there must be one-to-one matching between jobs and machines. Which set of pairs constitutes the minimum-cost solution using the assignment method?   A)  1-B, 2-C, 3-A B)  1-B, 2-A, 3-C C)  1-A, 2-C, 3-B D)  1-A, 2-B, 3-C E)  1-C, 2-A, 3-B


A) 1-B, 2-C, 3-A
B) 1-B, 2-A, 3-C
C) 1-A, 2-C, 3-B
D) 1-A, 2-B, 3-C
E) 1-C, 2-A, 3-B

F) B) and D)
G) A) and B)

Correct Answer

verifed

verified

Effective scheduling cannot:


A) yield cost savings and improved productivity.
B) reduce the need for expansion of facilities.
C) improve customer service.
D) eliminate the need to train employees.
E) improve patient care in medical settings.

F) A) and E)
G) B) and C)

Correct Answer

verifed

verified

D

The EDD priority rule usually does well with regard to:


A) cost.
B) lateness.
C) overtime.
D) waste.
E) makespan.

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows: The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client. Accordingly, she has estimated the time it should take for each of her top consultants-Charlie, Betty, Johnny, and Rick-to complete any of the four projects, as follows:   Assume there must be one-to-one matching between consultants and projects. What is the optimal assignment of consultants to projects? A)  Charlie to A; Betty to B; Johnny to C; Rick to D B)  Charlie to D; Betty to C; Johnny to B; Rick to A C)  Charlie to C; Betty to A; Johnny to D; Rick to B D)  Charlie to D; Betty to B; Johnny to C; Rick to A E)  Charlie to D; Betty to A; Johnny to C; Rick to B Assume there must be one-to-one matching between consultants and projects. What is the optimal assignment of consultants to projects?


A) Charlie to A; Betty to B; Johnny to C; Rick to D
B) Charlie to D; Betty to C; Johnny to B; Rick to A
C) Charlie to C; Betty to A; Johnny to D; Rick to B
D) Charlie to D; Betty to B; Johnny to C; Rick to A
E) Charlie to D; Betty to A; Johnny to C; Rick to B

F) D) and E)
G) A) and E)

Correct Answer

verifed

verified

E

Scheduling pertains to:


A) hiring workers.
B) process selection.
C) buying machinery.
D) timing the use of specific resources.
E) determining the lowest cost.

F) B) and C)
G) A) and B)

Correct Answer

verifed

verified

Similar to that in manufacturing, the service scheduling hierarchy begins with __________ and ends with _________.


A) aggregate planning; detailed daily scheduling
B) aggregate planning; master scheduling
C) master scheduling; detailed material planning
D) aggregate planning; detailed material planning
E) quarterly planning; monthly planning

F) B) and C)
G) A) and D)

Correct Answer

verifed

verified

Input/output (I/O) control refers to monitoring the productivity changes since productivity is determined by the ratio of output to input.

A) True
B) False

Correct Answer

verifed

verified

Priority rules generally assume that job setup cost is independent of the processing sequence of jobs.

A) True
B) False

Correct Answer

verifed

verified

The purpose of cyclical scheduling is to:


A) eliminate weekends and holidays.
B) establish work assignments that will repeat on a cyclical basis.
C) add flexible hours.
D) incorporate overtime.
E) rotate schedules across a service workforce to ensure everyone gets an equal number of weekends off per year.

F) None of the above
G) B) and D)

Correct Answer

verifed

verified

A schedule chart can be used to monitor job progress.

A) True
B) False

Correct Answer

verifed

verified

A scheduling technique used to achieve an optimum matching of tasks and resources is:


A) the assignment methoD.
B) Johnson's rule.
C) the optimum production technology method.
D) the appointment method.
E) the reservation method.

F) B) and C)
G) D) and E)

Correct Answer

verifed

verified

A work center can be a: (I) machine. (II) group of machines. (III) department. IV) a part used to produce a product.


A) I, II, and III only
B) II and IV only
C) II and III only
D) I and III only
E) I, II, III, and IV

F) B) and E)
G) C) and E)

Correct Answer

verifed

verified

Priority rules are used in low-volume systems to identify an optimal processing sequence.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is critical to effective yield management?


A) one-price pricing
B) forecasting
C) capacity flexibility
D) constant demand
E) trained service personnel

F) A) and D)
G) A) and C)

Correct Answer

verifed

verified

B

Showing 1 - 20 of 98