What is a data flow diagram (DFD) ?


A) Illustrates the movement of information between external entities and the processes and data stores within the system.
B) Software suites that automate systems analysis, design, and development.
C) A formal, approved document that manages and controls the entire project.
D) Involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment.

E) B) and C)
F) All of the above

Correct Answer

verifed

verified

Which of the following is not a technique for choosing strategic projects?


A) Categorize projects
B) Perform a financial analysis
C) Focus on organizational goals
D) Develop a project plan

E) A) and B)
F) B) and D)

Correct Answer

verifed

verified

What measures the project time frame to ensure that it can be completed on time?


A) Economic feasibility
B) Operational feasibility
C) Schedule feasibility
D) Technical feasibility

E) B) and D)
F) All of the above

Correct Answer

verifed

verified

What is a status report?


A) Difficult to quantify or measure.
B) Easy to quantify and typically measured to determine the success or failure of a project.
C) The measure of the tangible and intangible benefits of an information system.
D) A periodic reviews of actual performance versus expected performance.

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

What represents key dates when a certain group of activities must be performed?


A) Project milestones
B) Project objectives
C) Project assumptions
D) Project deliverable

E) All of the above
F) B) and C)

Correct Answer

verifed

verified

The traditional waterfall methodology is a sequential, activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.

A) True
B) False

Correct Answer

verifed

verified

What details the steps the system must perform along with the expected result of each step in the implementation phase the organization places the system into production so users can begin to perform actual business operations with it?


A) Testing phase
B) Testing documentation
C) Test conditions
D) All of the above

E) None of the above
F) A) and D)

Correct Answer

verifed

verified

Prototyping is a modern design approach by which the designers and system users use an iterative approach to building the system.

A) True
B) False

Correct Answer

verifed

verified

A data flow diagram involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment.

A) True
B) False

Correct Answer

verifed

verified

Conversion occurs when a person or event is the catalyst for implementing major changes for a system to meet business changes.

A) True
B) False

Correct Answer

verifed

verified

A requirements definition document prioritizes all of the business requirements by order of importance to the company.

A) True
B) False

Correct Answer

verifed

verified

What is technical feasibility?


A) Measures the cost-effectiveness of a project.
B) Measures how well a solution meets the identified system requirements to solve the problems and take advantage of opportunities.
C) Measures the project time frame to ensure that it can be completed on time.
D) Measures the practicality of a technical solution and the availability of technical resources and expertise.

E) A) and C)
F) A) and D)

Correct Answer

verifed

verified

In-sourcing is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house.

A) True
B) False

Correct Answer

verifed

verified

Conversion modifies software to meet specific user or business requirements.

A) True
B) False

Correct Answer

verifed

verified

The project managers are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion.

A) True
B) False

Correct Answer

verifed

verified

What is a session where employees meet, sometimes for several days, to define or review the business requirements for the system?


A) Joint application development
B) Requirements management
C) Process modeling
D) Data flow diagram

E) All of the above
F) None of the above

Correct Answer

verifed

verified

A web service is an open-standards way of supporting interoperability.

A) True
B) False

Correct Answer

verifed

verified

Information systems audit reports assess a company's information system to determine necessary changes and to help ensure the information systems' availability, confidentiality, and integrity.

A) True
B) False

Correct Answer

verifed

verified

What is a business-driven enterprise architecture that supports integrating a business as linked, repeatable activities, tasks, or services?


A) Service-oriented architecture
B) Service
C) Loose coupling
D) Interoperability

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

Loose coupling is the capability of services to be joined together on demand to create composite services, or disassembled just as easily into their functional component.

A) True
B) False

Correct Answer

verifed

verified