Filters
Question type

Study Flashcards

Extensible Markup Language (XML) is a markup language for documents, containing structured information.

A) True
B) False

Correct Answer

verifed

verified

In-sourcing has been instrumental in creating a viable supply of IT professionals and in creating a better quality workforce combining both technical and business skills.

A) True
B) False

Correct Answer

verifed

verified

Object-oriented languages provide a programming method that provides for interactive modules to a website.

A) True
B) False

Correct Answer

verifed

verified

Discovery prototyping builds a small-scale representation or working model of the system to ensure that it meets the user and business requirements.

A) True
B) False

Correct Answer

verifed

verified

Which phase of the SDLC gathers business requirements?


A) Plan
B) Analysis
C) Test
D) Design

E) A) and C)
F) A) and D)

Correct Answer

verifed

verified

What type of chart typically displays the critical path?


A) Gantt chart
B) PERT chart
C) All of the above
D) None of the above

E) B) and D)
F) All of the above

Correct Answer

verifed

verified

Internal reports present data that is distributed inside the organization and is intended for employees within an organization. Internal reports typically support day-to-day operations monitoring that supports managerial decision making.

A) True
B) False

Correct Answer

verifed

verified

What is a markup language for documents, containing structured information?


A) Service-oriented architecture
B) Service
C) Extensible markup language
D) Interoperability

E) A) and C)
F) B) and C)

Correct Answer

verifed

verified

User acceptance testing (UAT) determines if the system satisfies the user and business requirements.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not a characteristic of a well-defined project plan?


A) Prepared by the project manager
B) Easy to read
C) Appropriate to the project's size
D) Communicated to all key participants

E) None of the above
F) A) and D)

Correct Answer

verifed

verified

Which of the following is a business-related consequence of failing software?


A) Decrease productivity
B) Damage to brand reputation
C) Increased liabilities
D) All of the above

E) B) and C)
F) A) and C)

Correct Answer

verifed

verified

A web service is an open-standards way of supporting interoperability. Web services are application programming interfaces (API) that can be accessed over a network, such as the Internet, and executed on a remote system hosting the requested services.

A) True
B) False

Correct Answer

verifed

verified

Which methodology provides a framework for breaking down the development of software into four gates?


A) SCRUM
B) XP
C) RAD
D) RUP

E) A) and D)
F) B) and D)

Correct Answer

verifed

verified

What are software suites that automate systems analysis, design, and development?


A) Data flow diagram
B) Computer-aided software engineering (CASE) tools
C) Systems development life cycle
D) Process modeling

E) None of the above
F) All of the above

Correct Answer

verifed

verified

Which of the following is a fundamental of the RAD methodology?


A) Focus initially on creating a prototype that looks and acts like the desired system
B) Actively involve system users in the analysis, design, and development phases
C) Accelerate collecting the business requirements through an interactive and iterative construction approach
D) All of the above

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

Unit testing uses both the legacy system and new system until all users verifies that the new system functions correctly.

A) True
B) False

Correct Answer

verifed

verified

What do SMART criteria for successful objective creation include?


A) Specific, metrics, agreed upon, real, time valued
B) Specific, measurable, agreed upon, realistic, time framed
C) Specific, measurable, accurate, real, time valued
D) Specific, metrics, agreed upon, realistic, time framed

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

Iterative development consists of a series of tiny projects. It has become the foundation of multiple agile methodologies.

A) True
B) False

Correct Answer

verifed

verified

What measures how well a solution can be implemented within existing legal and contractual obligations?


A) Political feasibility
B) Operational feasibility
C) Schedule feasibility
D) Legal feasibility

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Business requirements include the process of transferring information from a legacy system to a new system.

A) True
B) False

Correct Answer

verifed

verified

Showing 301 - 320 of 321

Related Exams

Show Answer