What is the outsourcing option that includes the closest location and direct customer control?


A) Onshore outsourcing
B) Nearshore outsourcing
C) Offshore outsourcing
D) None of the above

E) A) and B)
F) C) and D)

Correct Answer

verifed

verified

Onshore outsourcing occurs when engaging another company within the same country for services.

A) True
B) False

Correct Answer

verifed

verified

Post-implementation reports are formal reports or audits of a project after it is up-and-running.

A) True
B) False

Correct Answer

verifed

verified

The design phase establishes descriptions of the desired features and operations of the system including screen layouts, business rules, process diagrams, pseudo code, and other documentation.

A) True
B) False

Correct Answer

verifed

verified

Project assumptions are specific factors that can limit options including budget, delivery dates, available skilled resources, and organizational policies.

A) True
B) False

Correct Answer

verifed

verified

What is feasibility?


A) Difficult to quantify or measure.
B) Easy to quantify and typically measured to determine the success or failure of a project.
C) The measure of the tangible and intangible benefits of an information system.
D) A periodic reviews of actual performance versus expected performance.

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

Requirements management is the process of managing changes to the business requirements throughout the project.

A) True
B) False

Correct Answer

verifed

verified

Which assembly language is difficult for people to understand?


A) Fifth generation machine language
B) Second generation machine language
C) Third generation machine language
D) Fourth generation machine language

E) B) and D)
F) A) and D)

Correct Answer

verifed

verified

The executive sponsor is the person or group who provides the financial resources for the project.

A) True
B) False

Correct Answer

verifed

verified

An organization must identify what it wants to do and how it is going to do it. What does the "how" part of this question focus on?


A) Justification of the project
B) Definition of the project
C) Analysis of project risks
D) Expected results of the project

E) All of the above
F) None of the above

Correct Answer

verifed

verified

Integration testing verifies that the units or pieces of code function correctly when integrated together.

A) True
B) False

Correct Answer

verifed

verified

What defines all project roles and indicates what responsibilities are associated with each role?


A) Communication plan
B) Responsibility matrix
C) Project assumptions
D) Project deliverable

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

What breaks a project into tiny phases, and developers cannot continue on to the next phase until the first phase is complete?


A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming

E) A) and C)
F) B) and D)

Correct Answer

verifed

verified

An agile methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process using the bare minimum requirements.

A) True
B) False

Correct Answer

verifed

verified

What is political feasibility?


A) Measures how well the solution will be accepted in a given opportunity.
B) Measures how well a solution meets the identified system requirements to solve the problems and take advantage of opportunities.
C) Measures the project time frame to ensure that it can be completed on time.
D) Measures the practicality of a technical solution and the availability of technical resources and expertise.

E) B) and D)
F) None of the above

Correct Answer

verifed

verified

Which of the following is a benefit an organization can receive from outsourcing?


A) Financial savings
B) Increase technical abilities
C) Market agility
D) All of the above

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

What illustrates the movement of information between external entities and the processes and data stores within the system?


A) Data flow diagram
B) Computer-aided software engineering (CASE) tools
C) Systems development life cycle
D) Process modeling

E) A) and C)
F) B) and C)

Correct Answer

verifed

verified

Fourth generation programming languages that look similar to human languages.

A) True
B) False

Correct Answer

verifed

verified

Which gate is construction?


A) Gate one
B) Gate two
C) Gate three
D) Gate four

E) A) and C)
F) B) and C)

Correct Answer

verifed

verified

What determines if the system satisfies the user and business requirements?


A) Alpha testing
B) Development testing
C) Integration testing
D) User acceptance testing

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

Showing 81 - 100 of 321