Filters
Question type

Study Flashcards

___________ outsourcing refers to contracting an outsourcing arrangement with a company in a nearby country.

Correct Answer

verifed

verified

Project assumptions are specific factors that can limit options including budget,delivery dates,available skilled resources,and organizational policies.

A) True
B) False

Correct Answer

verifed

verified

The _________ methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirement.

Correct Answer

verifed

verified

Which of the following is not a characteristic of a well-defined project plan?


A) Prepared by the project manager
B) Easy to read
C) Appropriate to the project's size
D) Communicated to all key participants

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

What consists of a series of tiny projects?


A) Waterfall methodology
B) Iterative development
C) Agile methodology
D) All of the above

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

What is the analysis phase in the SDLC?


A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) Involves placing the system into production so users can begin to perform actual business operations with the system

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

What is the implementation phase in the SDLC?


A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) Involves placing the system into production so users can begin to perform actual business operations with the system

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

Which reports provide an internal report that highlights situations occurring outside of the normal operating range for a condition or standard?


A) Internal reports
B) Detailed internal reports
C) Summary internal reports
D) Exception reports

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

What statement links the project to the organization's overall business goals.It describes the business need (the problem the project will solve) and the justification,requirements,and current boundaries for the project?


A) Project milestones
B) Project objectives
C) Project scope
D) Project deliverable

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

__________ objects for information and related technology (COBIT)is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors.

Correct Answer

verifed

verified

Conversion occurs when a person or event is the catalyst for implementing major changes for a system to meet business changes.

A) True
B) False

Correct Answer

verifed

verified

What is also provided for the system users and can be online or in a classroom?


A) Training
B) Testing
C) Implementation phase
D) Testing phase

E) C) and D)
F) None of the above

Correct Answer

verifed

verified

Project milestones are any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.

A) True
B) False

Correct Answer

verifed

verified

The testing phase takes all the detailed design documents from the design phase and transforms them into the actual system.

A) True
B) False

Correct Answer

verifed

verified

Information systems __________ reports assess a company's information system to determine necessary changes and to help ensure the information systems' availability,confidentiality,and integrity.

Correct Answer

verifed

verified

Pilot implementation is a small group of people use the new system until it is verified that it works correctly then the remaining users migrate.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not one of the four gates in the RUP methodology?


A) Inception
B) Collaboration
C) Construction
D) Transition

E) All of the above
F) None of the above

Correct Answer

verifed

verified

Detailed internal reports present information with little or no filtering or restrictions of the data.

A) True
B) False

Correct Answer

verifed

verified

____________ is a common approach using the professional expertise within an organization to develop and maintain the organization's information technology systems.

Correct Answer

verifed

verified

Project __________________ are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion.

Correct Answer

verifed

verified

Showing 181 - 200 of 293

Related Exams

Show Answer