"Self-directed teams" are allowed to make changes in the work processes under their control.

A) True
B) False

Correct Answer

verifed

verified

What is the normal time (NT) for this task if the employee worked at a fifty-percent faster pace than is average?


A) 45 seconds
B) 60 seconds
C) 90 seconds
D) 135 seconds
E) 180 seconds

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

Management compensation should be based primarily on organizational output.

A) True
B) False

Correct Answer

verifed

verified

Between what limits can the manager be 68.26 percent confident the true proportion of time spent mowing is?


A) 0 and .683
B) .475 and .525
C) .45 and .55
D) .425 and .575
E) .4 and .6

F) B) and E)
G) A) and B)

Correct Answer

verifed

verified

Job enrichment involves giving a workers a greater share of the total task which is why they feel enriched.

A) True
B) False

Correct Answer

verifed

verified

Determining the number of cycles to observe is an element of ________.


A) Stop watch time study
B) Standard elemental times
C) Predetermined time standards
D) Work sampling
E) MTM tables

F) C) and E)
G) None of the above

Correct Answer

verifed

verified

How many observations would be needed to be 95.44% confident that the maximum error in the observed time is 1 second? Assume that the standard deviation of the task time is 2 seconds.

Correct Answer

verifed

verified

A job had an observed cycle time of four minutes, a performance rating of 80 percent, and an allowance factor that was 20 percent of job time.Normal time for the job in minutes is:


A) 3.20
B) 3.84
C) 4.00
D) 4.80
E) 5.00

F) C) and D)
G) D) and E)

Correct Answer

verifed

verified

For a confidence level of 95.44% and a maximum error of .04, what should be the sample size for estimating the proportion of time spent performing activity C?

Correct Answer

verifed

verified

What is the effect of an increase in the desired confidence level on the number of observations necessary in a time study?


A) increases
B) decreases
C) unaffected
D) may increase or decrease, depending on the sample standard deviation
E) impossible to say without additional information

F) C) and E)
G) A) and D)

Correct Answer

verifed

verified

What is the estimated proportion of time this worker spends performing activity B?

Correct Answer

verifed

verified

A flow process chart is helpful for visualizing the portions of a work cycle during which the operator and equipment are busy or idle.

A) True
B) False

Correct Answer

verifed

verified

When performing a time study, the analyst converts the observed time into the time an "average" worker would require working at an acceptable pace by using which of the following?


A) allowance factors
B) MTM
C) methods analysis
D) performance rating
E) analysis of therbligs

F) A) and B)
G) A) and E)

Correct Answer

verifed

verified

What is the standard time (ST) for this task if the employee worked at a fifty-percent faster pace than is average, and an allowance of twenty percent of job time is used?


A) 90 seconds
B) 99 seconds
C) 100 seconds
D) 162 seconds
E) 150 seconds

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

One of the potential benefits of "self-directed teams" is higher quality.

A) True
B) False

Correct Answer

verifed

verified

What is the observed time (OT) for this task?


A) 34 seconds
B) 40 seconds
C) 46 seconds
D) 48 seconds
E) 240 seconds

F) B) and C)
G) D) and E)

Correct Answer

verifed

verified

The chart used to review the overall sequence of an operation by focusing on either the movements of the operator or materials is called a _________.


A) SIMO-chart
B) Gantt chart
C) Worker-materials chart
D) Flow process chart
E) Multi-activity chart

F) B) and C)
G) A) and C)

Correct Answer

verifed

verified

Therbligs are basic elemental motions.

A) True
B) False

Correct Answer

verifed

verified

If the person observed worked at a pace that is 80 percent of normal, and if the appropriate allowance for this task is 25 percent of job time, what should be the standard time?

Correct Answer

verifed

verified

Studies on worker efficiency and time of day suggest the greatest efficiency is at the end of the day when workers are 'warmed up'.

A) True
B) False

Correct Answer

verifed

verified